HOGESCHOOL UTRECHT


The HU in Amersfoort has relocated to a new building where different disciplines can share a collective space. The ground floor spatially connects through to the first floor through stairs and large voids. The sightlines this design choice creates encourage spatial awareness, orientation and transparency and makes for easy encounters and dynamism. The floors higher up along the red face of the building are more peaceful, but they also enjoy the spatial transparency created by the voids. As a direct result of the neutral floors and the white, homologous ceilings, the overall quality of the building’s interior is calm and collected. Some of the walls are carried out as ‘poster walls’: walls with portions covered in collages, posters or banners, that can be modified by the users of the HU.
The formal language of the unique elements is orthogonal, with three basic types: white, wood and multi-colored. Special interior elements for the different courses also have large, easily interchangeable lettering painted on.


Publicaties over dit project

location

Amersfoort

address project

De Nieuwe Poort 21, Amersfoort

Client

Lips Capital Group, Utrecht

Gross Floor Area

18000 sqm

date design

2007

date completed

2010

architect

Chris de Weijer & Robert Alewijnse

team

Daan van der Vlist, Ines Lellek, Kerstin Tresselt, Harrie Hupperts, Diana de Kroo, Christiaan ten Have, Carolina Sumares, Patricia Cortijo, Jimmy van der Aa, Allard de Goeij, Anna Jaeger, Lilly Mitsiou

program

College building in Amersfoort

consultants

IMd Raadgevende Ingenieurs, Rotterdam | Boersema Installatie Adviseurs, Amersfoort | DGMR Raadgevende Ingenieurs, Arnhem | BOAG, Rotterdam

contractor

Vannel Bouwbedrijf, Eindhoven

Keywords

Compact / Sustainability / Flexible / Custom made /

Share this project via


ALL PROJECTS LANDSCAPE/URBAN PLANNING BRIDGES UTILITY SCHOOLS HOUSING INTERIOR
 PROJECT NAME CHRONOLOGICAL UNDER CONSTRUCTION COMPLETED LOCATION